Narayana Apartments, Kalpathy, Palakkad

Narayana Apartments

Narayana Apartments

Pioneer's "Narayana Apartment" is located in the middle of around 10 acres of land owned by Sri. C.A. Subbaraman, near to Palakkad Town in Palakkad Calicut high way. Sri. C.A. Subbaraman an agriculturist by birth who forsaw this development some 20 years back, got Zonal exemption for his whole property in the year 1992 and development permit from Palakkad municipality in the year 1998 after a long struggle.

Rural atmosphere at Urban area. All day to day necessities are near by located. It is a perfect example of our Pioneering trends in building ultra modern facilities and environment friendly features that are hallmarks of this imposing structure.

 

Narayana Apartments

Narayana Apartments

Narayana Apartments

Technical Details of Narayana Apartments

Narayana Apartments

Narayana Apartments

Narayana Apartments

Type A Type B Type C

Type D Type E Type F

Location Map of Narayana Apartments

Places in Vicinity

  • Kota Maidan: 3 Km
  • Dist Hospital: 3 Km
  • Victoria College: 1 Km
  • Palakkad Town Railway Station: 2.5 Km
  • KSRTC: 3 Km
  • Olavakode Junction: 1 Km
  • Schools: with in 0.5 Km radius
  • NSS Engineering College: 5 Km
  • Temples: 0.25 Km Radius

Structure: R.C.C. As per structural Drawing.
Superstructure: Solid concrete Blocks.
Plastering: Using cement & Rock sand.
Doors Frames & Doors: Hard wood of size 4”x 3” for frames and hardwood panel doors.
Windows/Shutters: UPVC Frames & Shutters for windows & balcony.
Grills: Windows will be protected by Iron grills.
Glasses: 3mm Pin head white glasses for window shutters.
Bathroom Doors: Fibre Glass Doors.
Painting: Light putty work in the inside walls with single coat primer and doble coat emulsion. Whether protective emulsion in the outside walls.Windows & Grills will be painted using Enamel paints.
Kitchen Window: Protected by iron grills with upvc shutters.
Electrical: Incomong energy from Transformer in three phase to individual DB Box inside each flat eqquiped with MCB,ELCB,Isolator and wired in copper cable with 5 Amps Light & Fan points in all rooms, 16 Amps power plug in kitchen and bath room, 32 Amps DP Switch In Master Bed and Plug points for TV, Fridge, etc.
Swithes: Modular switches with ISI Specification.
Cable / Telephone: Concealed pipes for T.V. & Telephone cable will be provided in Drawing room.
Flooring: Vitrified Tiles.
Bathroom / Kitchen Walls: Glazed tiles up to six feet height in bath room and two feet above kitchen platform will be pasted. Non slippery tiles will be laid in Batroom floors.
Bathroom Fittings: Ceramic cascade type closets. Wash basin in all bath rooms & in dining hall. All ceramic wares will white in colour.
Taps: Mixer Tap/ Divertor , One shower connection , One Wash basin and one healthfaucet connection will be provided in all bathrooms. Fittings will be of ISI specification.
Zink: Stainless Steel Zinc of size 18x20 will be provided in kitchen with two long body taps.
Zink: Stainless Steel Zinc of size 18x20 will be provided in kitchen with two long body taps.
Kitchen/ Platform: 2 Ft loft in any one side will be provided .Platform will be pasted with black galaxy Granite slab.
Common Area: Verified tiles/Granite of good quality will be layed in all common areas.
Water: Well Water in all taps and Malampuza Water in Kitchen .

At the time of Agreement 20%
At the time of Basement Footing 3%
At the time of Basement floor Main slab 3%
At the time of First floor Main slab 3%
At the time of Second floor Main slab 3%
At the time of Third floor Main slab 3%
At the time of Fourth floor Main slab 3%
At the time of Fifth floor Main slab 3%
At the time of Sixth floor Main slab 3%
At the time of Seventh floor Main slab 3%
At the time of Eighth floor Main slab 3%
At the time of Ninth floor Main slab 3%
At the time of Tenth floor Main slab 3%
At the time of Eleventh floor Main slab 3%
At the time of Twelth floor & Pent house Main slab 3%
At the time of First floor Block work 3%
At the time of Second floor Block work 3%
At the time of Third floor Block work 3%
At the time of Fourth floor Block work 3%
At the time of Fifth floor Block work 3%
At the time of Sixth floor Block work 3%
At the time of Seventh floor Block work 3%
At the time of Eighth floor Block work 3%
At the time of Ninth floor Block work 3%
At the time of Tenth floor Block work 3%
At the time of Eleventh floor Block work 3%
At the time of Flat plastering /Inside Electrical completion 2%
At the time of Flat Flooring/Inside Plumbing Completion 2%
At the time of Flat Painting & Registration 1%
Total
Registration Extra
100%

TOP